Direct Answers

What Size UPS Do I Need? Direct Answers by Load and Runtime

By Procure FZE 10 min read
A row of tall uninterruptible power supply cabinets in a UAE server room

The whole calculation is three steps. One: add up the watts of everything that must stay on. Two: add 25 per cent headroom. Three: divide by 0.9 to convert watts to VA. A desk with a PC and two monitors is about 200 W, so 250 W, so roughly a 280 VA load — which in practice means a 650 VA or 850 VA unit, because the smallest sensible UPS is bigger than that anyway. Everything else on this page is that formula applied to the situations we actually get asked about.

The direct answers

What you are protecting Typical load UPS size to ask for Topology
One desk: PC, two monitors 150–250 W 650–1000 VA Line-interactive
Retail till: POS terminal, receipt printer, scanner, router 150–300 W 1000–1500 VA Line-interactive
Comms cabinet: switch, router, firewall, access point controller 100–400 W 1000–2000 VA Line-interactive or online
CCTV: NVR plus PoE switch and monitor 150–500 W 1500–3000 VA Line-interactive or online
One small server plus a switch 400–700 W 1500–2200 VA Online double-conversion
Half-populated rack: two or three servers, storage, switching 1500–3000 W 3000–6000 VA Online double-conversion
Full server room or comms room 5 kW and up Site survey — 10 kVA and up, often with a bypass Online double-conversion
Classroom or lab of 20 PCs 3000–5000 W Protect the network and the teacher station, not every PC Line-interactive

Those load figures are typical ranges for planning. For a quote we use the actual nameplate ratings, because a workstation with a graphics card and a thin client are both "a PC" and are nothing like each other.

VA and watts are not the same number

A UPS is sold in VA (volt-amps, the apparent power) and also rated in watts (the real power it can actually deliver). The ratio between them is the power factor.

  • Modern UPS units are typically around 0.9 power factor, so a 1000 VA unit delivers roughly 900 W.
  • Older and cheaper units run as low as 0.6, so a 1000 VA unit delivers only about 600 W.

Always size against the watt rating, not the VA figure on the box. The VA number is the one on the marketing material and it is the one that flatters. Two units both labelled 1500 VA can differ by 450 W in what they will actually carry, which is the difference between a UPS that works and one that trips on overload the first time everything is running at once.

Runtime does not scale the way people expect

Doubling the runtime costs much more than double the battery. Batteries deliver less total energy the harder they are discharged, so a UPS that gives 10 minutes at full load will not give 20 minutes with twice the battery — it gives rather less. The same effect works in your favour downwards: run a UPS at half load and you get considerably more than double the runtime.

Three practical consequences:

  1. A standard tower UPS gives you minutes, not hours. Typically five to fifteen minutes at full load. That is enough to ride out a brief dip and to shut down gracefully. It is not enough to keep working through an outage.
  2. If you need more than about fifteen minutes, buy a unit that accepts external battery packs rather than oversizing the UPS itself. Check this before you buy; many smaller units cannot take them at all.
  3. If you need hours, you need a generator, with the UPS covering the gap until it starts and stabilises. A UPS is a bridge, not a power source.

And size for a graceful shutdown rather than for continued work. A server that is told to shut down cleanly in the four minutes it has is a far better outcome than one that runs for nine minutes and then stops dead mid-write. That means installing the shutdown software or network management card, not just plugging in the UPS. Runtime planning in detail: APC vs Eaton UPS runtime planning.

The rear panel of a floor-standing uninterruptible power supply showing outlet banks, a fan grille and cable entry
Count the outlets as well as the watts. Running out of sockets is the second most common sizing mistake.

Which topology

Type How it works Use it for
Offline / standby Passes mains through, switches to battery when it fails A single home PC. Rarely the right answer in a business.
Line-interactive Passes mains through but regulates voltage with an internal transformer, correcting sags and surges without using the battery The default for offices: desks, tills, comms cabinets, CCTV, small network gear
Online double-conversion Continuously rebuilds the output waveform from DC — the load never touches raw mains, and there is no transfer time at all Servers, storage, anything with a critical database, and any site with dirty or unstable power

The short rule: line-interactive for equipment, online for anything that would be damaged or corrupted by a transfer gap. Online units cost more, run warmer and often have a fan that is audible — which is fine in a comms room and unwelcome under a reception desk.

The UAE problem nobody mentions: heat

Sealed lead-acid battery life is strongly temperature-dependent. The widely used engineering rule of thumb is that every 10 °C above about 25 °C roughly halves battery service life. A UPS rated for three to five years of battery life in a cool comms room can lose a large part of that in a hot cupboard, a ceiling void, an unconditioned store or a cabinet with no airflow.

So, three rules for this region specifically:

  • Put the UPS where the air conditioning is, and leave clearance around it. A UPS in a sealed cupboard heats its own batteries.
  • Budget for battery replacement every three to five years, and sooner in a hot location. This is a consumable, not a failure. Our piece on this is UPS battery replacement and runtime decay.
  • Test the runtime annually. Batteries fail quietly; the first anyone knows is usually during the outage the UPS was bought for. A managed unit will self-test and report; an unmanaged one needs someone to check.

Six mistakes that cost money

Plugging a laser printer into the UPS. A laser fuser draws a large current spike every time it heats, which can overload a UPS sized correctly for everything else on it. Put printers on the surge-only outlets or on a separate socket.

Sizing on VA instead of watts. Covered above, and the single most common error.

Forgetting to leave growth headroom. The 25 per cent in the formula is not padding; it covers the switch that gets added next year and the fact that a UPS running at 95 per cent load has almost no runtime.

Running out of outlets. Check the socket count and the socket type against what you are plugging in, and note that on most units only some outlets are battery-backed while the rest are surge-only.

Buying a UPS and never installing the shutdown software. Without it the UPS protects the hardware and does nothing for the data. Fit the USB connection or the network management card, and test that the server actually shuts down.

Protecting the PCs and forgetting the network. A room full of battery-backed computers with a dead switch, router and access point is a room full of people who cannot work. In a classroom or open-plan office, protecting the network and the key stations is usually a better use of the same budget than protecting every desk.

How to work out your own number

  1. List everything that must stay on — and be strict. Printers and phone chargers do not qualify.
  2. Find the watts for each. The rating label on the back of the device gives watts, or amps and volts, in which case watts is amps × volts. Use the nameplate figure, not a guess.
  3. Add them up. That is your real load.
  4. Add 25 per cent for growth and headroom.
  5. Divide by the power factor — 0.9 on a modern unit — to get the VA figure to shop with.
  6. Then check the runtime chart for the unit you have chosen, at your load, and confirm it covers a clean shutdown.

Worked example. A comms cabinet with a 48-port PoE switch drawing 300 W, a firewall at 30 W and an NVR at 60 W comes to 390 W. Plus 25 per cent is 488 W. Divided by 0.9 is 542 VA — so a 1000 VA online unit comfortably covers it with room for the next device, and at roughly half load it will deliver well over the runtime quoted at full load.

What we stock

The full range sits in uninterruptible power supply, with UPS accessories covering external battery packs, network management cards and rack mounting. By brand: APC, Eaton, Tripp Lite by Eaton, ABB, Emerson, Premax and Techcom. Background reading: UPS and power protection for offices and branch sites.

Frequently asked questions

What size UPS do I need for a desktop PC and two monitors?

A 650 to 1000 VA line-interactive unit. A typical desktop with two monitors draws 150 to 250 watts, which with 25 per cent headroom and a 0.9 power factor comes out below 350 VA — but the smallest practical business UPS is larger than that, and the extra capacity buys you useful runtime.

What size UPS do I need for a server?

For one small server plus a switch, 1500 to 2200 VA, and it should be online double-conversion rather than line-interactive. For a half-populated rack with two or three servers and storage, 3000 to 6000 VA. Above about 5 kW of load, the sizing needs a site survey rather than a table.

How do I convert VA to watts?

Multiply the VA by the power factor. Modern units are typically around 0.9, so a 1000 VA UPS delivers roughly 900 watts. Older or cheaper units can be as low as 0.6, where the same 1000 VA delivers only about 600 watts. Always size against the watt rating, because the VA figure is the one that flatters.

How long will a UPS run my equipment?

A standard tower UPS gives five to fifteen minutes at full load — enough to ride out a brief dip and shut down cleanly, not enough to keep working. Runtime rises sharply at lower load, so a unit at half load gives considerably more than double. For more than about fifteen minutes you need external battery packs; for hours you need a generator with the UPS bridging the start-up.

What is the difference between line-interactive and online UPS?

A line-interactive UPS passes mains through while regulating voltage, switching to battery when the supply fails, which leaves a very short transfer gap. An online double-conversion UPS continuously rebuilds the output from DC, so the load never touches raw mains and there is no transfer time at all. Line-interactive is the office default; online is for servers, storage and any site with unstable power.

How long do UPS batteries last in the UAE?

Three to five years in a properly cooled room, and considerably less in a hot one. The engineering rule of thumb is that every 10 °C above about 25 °C roughly halves battery service life, so a UPS in a sealed cupboard or an unconditioned store will need batteries far sooner than the datasheet suggests. Treat batteries as a scheduled consumable and test the runtime annually.

Can I plug a printer into a UPS?

Not a laser printer. The fuser draws a large current spike every time it heats, which can overload a UPS that is correctly sized for everything else on it. Use the surge-only outlets or a separate socket. Small inkjets are generally fine but rarely worth the battery capacity.

Should I protect every PC in an office?

Usually not. A room of battery-backed computers with a dead switch, router and access point still cannot work. Protecting the network equipment, the server and the handful of stations that matter is a better use of the same budget than putting a small UPS under every desk.

How much headroom should I leave?

Twenty-five per cent above your measured load. It covers equipment added later and keeps the UPS off its limit — a unit running at 95 per cent load has very little runtime left and no tolerance for an inrush.


Send us your load list and we will size it. List what must stay on with the watts from each rating label, tell us how long you need and where the unit will sit, and we will come back with the right capacity, the right topology and whether you need external battery packs. Talk to Procure — we supply and install UPS systems across Dubai, Abu Dhabi and the wider UAE.